Specifications
SKU: 99999
- Packaging: 25 kg bag
- Coverage: Approximately 1.6 kg/m² per mm of thickness
- Mixing Ratio: 6.0 to 6.5 litres of water (or 24-25 parts water) per 100 parts by weight of powder
- Pot Life: 20–30 minutes
- Light Foot Traffic: 3–4 hours
- Waiting Time Before Floor Installation: 24 hours
- Ideal for leveling concrete slabs, cement screeds, and smoothing over existing ceramic or terrazzo tiles before laying vinyl, carpet, or wood.
- Fast-hardening properties allow quick project turnarounds.
- Requires the substrate to be primed (such as with MAPEI Primer G) before application
Untitled
Inquiry - Mapei Novoplan 21